Karen and I attended a
DCRO practice session at Knotlow Triangle. To begin with we set up
the Multipod with two legs by the entrance to Hillocks Mine as if the
entrance ravine was a feature like Eldon Hole.
We tried setting up
the Slix 100 stretcher so that it could be hauled horizontally or
vertically depending on which of the two haul ropes were taken in. We
put some tackle bags of gear in the stretcher instead of a volunteer.
Afterwards we moved to
the Whalf pipe Engine Shaft and with Jock in the stretcher, we
lowered it down about 20 metres then hauled it up using both a
horizontal mode and then vertical at the top. A newcomer called Edwin
acted as “Barrow Boy”.
No comments:
Post a Comment